Full check report
1 detail is missing. 2 do not match.
1 point could not be read. Check it by hand.
- Product
- LB-E27-9W-27
- Files checked
- DoC · DoC_LB-E27-9W-27.pdf · 1 page
- Test report 1 (safety) · Safety_report_EXL-S-2603-118.pdf · pages 1–25 of 38
- Test report 2 (EMC) · EMC_report_EXL-E-2602-047.pdf · 24 pages
- Label photo · label.jpg · 1 page
- Checked on
- , read by an AI model, confirmed by you, decided by fixed rules
- Product answers
- Mains powered · Light source
- EU laws for this product
- Low Voltage Directive 2014/35/EU · EMC Directive 2014/30/EU · RoHS Directive 2011/65/EU · Ecodesign (2009/125/EC or ESPR 2024/1781) with its product rule
01The DoC itself
This section checks the nine parts of the EU model, the laws for this product, the standards and red flags.
- Note
Packaging needs its own EU DoC since 12 Aug 2026.
Under the PPWR, the packaging manufacturer (often the brand owner) signs a packaging DoC. It can be separate from this DoC.
Fix: Use the PPWR packaging tool from Rulecart to see if you must sign it.
DoC
Source:PPWR (EU) 2025/40, Art 39 and Annex VIII (opens in a new tab)
- Note
Register the light source in EPREL before you sell it.
Light sources need an EPREL entry before the first unit is placed on the market, and an energy label on the box.
DoC
Source:Regulation (EU) 2017/1369, Art 4(1) (EPREL before first unit) (opens in a new tab)
Passed (18)
- The product model is named.
- The product is described.
- Manufacturer name and postal address are given.
- The sole-responsibility sentence is there.
- EU laws are listed.
- 7 standards are listed.
- Place, date, name and function of the signer are given.
- The Low Voltage Directive (2014/35/EU) is named.
- The EMC Directive (2014/30/EU) is named.
- The RoHS Directive (2011/65/EU) is named.
- Ecodesign rule 2019/2020 is named.
- EN 62560:2012 is on the EU list.
- EN 62471:2008 is on the EU list.
- EN 62493:2010 is on the EU list.
- EN 61547:2009 is on the EU list.
- EN 61000-3-2:2014 is on the EU list.
- EN 61000-3-3:2013 is on the EU list.
- EN IEC 63000:2018 is on the EU list.
02The DoC compared with the test reports
Models, dates, standards and results in all files
- Does not match
“Test report 2 (EMC)” does not name model LB-E27-9W-27.
The DoC names LB-E27-9W-27; the report lists LB-E27-9W. A test report only supports the DoC for the models it covers.
Fix: Ask for a report that names LB-E27-9W-27, or the lab’s written statement that EXL-E-2602-047 covers it.
DoC · page 1 LB-E27-9W-27
Test report 2 (EMC) · page 1 Model: LB-E27-9W
Source:LVD 2014/35/EU, Annex III, point 2(f) (technical documentation: test reports) (opens in a new tab)
- Does not match
The DoC is dated before “Test report 1 (safety)”.
DoC: 2026-03-02. Report: 2026-03-20. A DoC declares conformity on the basis of the technical file, so it normally comes after the last test.
Fix: Ask for a DoC dated on or after the last test report.
DoC · page 1 2026-03-02
Test report 1 (safety) · page 1 2026-03-20
03Label
CE marking, name, postal address, model and the bin symbol
- Missing
The label photo shows no postal address.
The label must show where the company can be reached by post.
Fix: Print the postal address next to the name, on the product or the box.
Label photo
Source:LVD 2014/35/EU, Art 6(6) and 8(3) (name and postal address) (opens in a new tab)
04Files
What was read and what was not
- Note
“Test report 1 (safety)”: pages 1–25 of 38 were read.
Cover, summary, models and standards sit on the first pages. The clause tables after them are not needed for these checks.
Test report 1 (safety)
05Could not read
Nothing is guessed. Check these points by hand, or upload a sharper copy and run the check again.
- Not read
The overall result in “Test report 1 (safety)” could not be read.
The text is blurred, cut off or covered. Nothing is guessed, so the checks that need it stay open.
Fix: Check this point yourself, or upload a sharper copy and run the check again.
Test report 1 (safety)
Fix it with your supplier
Email to your supplier
The email asks only for what the report shows as missing, not matching or worth checking. Add your name, and your company and address where the label needs them.
Subject: Documents needed for model LB-E27-9W-27 (EU CE file)
Hello, we checked the EU compliance documents for model LB-E27-9W-27. Please send us the following: 1. Please send a test report that names model LB-E27-9W-27, or the lab's written statement that report EXL-E-2602-047 covers model LB-E27-9W-27. 2. Please print our postal address on the product label: [street, postcode, city, country]. 3. Please send an EU declaration of conformity dated on or after the last test report (2026-03-20). Please reply with the documents, or with the date when you can send them. Thank you, [Your name] [Your company]
Corrected DoC draft
Filled in from your DoC and the facts you confirmed. Check it before you or your supplier signs it.
EU declaration of conformity
- 1Product model/product (product, type, batch or serial number)LB-E27-9W-27
- 2Name and address of the manufacturer or his authorised representativeExample Lighting Co., Ltd., No. 8 Example Road, Bao'an District, 518000 Shenzhen, China
- 3ResponsibilityThis declaration of conformity is issued under the sole responsibility of the manufacturer.
- 4Object of the declaration (identification allowing traceability)LED bulb E27, 9 W, 806 lm, 2700 K, model LB-E27-9W-27.
- 5Union harmonisation legislationThe object of the declaration described above is in conformity with the relevant Union harmonisation legislation: – Directive 2014/35/EU (Low Voltage Directive) – Directive 2014/30/EU (EMC Directive) – Directive 2011/65/EU (RoHS), as amended by Delegated Directive (EU) 2015/863 – Regulation (EU) 2019/2020 (ecodesign requirements for light sources) under Directive 2009/125/EC
- 6References to the relevant harmonised standards used, including the date of the standard, or to the other technical specifications– EN 62560:2012+A1:2015+A11:2019 – EN 62471:2008 – EN 62493:2010 – EN 61547:2009 – EN 61000-3-2:2014 – EN 61000-3-3:2013 – EN IEC 63000:2018
- 7Notified bodyNot applicable: no notified body was involved.
- 8Additional informationNone.
- Signed for and on behalf of
- Example Lighting Co., Ltd.
- Place and date of issue
- Shenzhen, 16 Nov 2026
- Name, function
- Li Wei, General manager